Automation component repair
UPS not holding
power?
We repair in 3–5 days.
Diagnostics included in repair · 12-month warranty · APC, Eaton, Emerson, ABB, Socomec
What do we repair?
Office, rack and three-phase industrial UPS — from 500 VA to over 100 kVA
VRLA / Li-Ion batteries
Replacement of VRLA (AGM, Gel), Li-Ion and Ni-Cd batteries — all popular types and capacities
IGBT inverter / converter
Inverter section repair, IGBT transistors and inverter controller — the heart of every online UPS
NMC and communication cards
Regeneration of NMC network management cards, SNMP cards and communication modules (APC, Eaton, Emerson)
Bypass / static switch
Repair and calibration of static bypass switch, relays and input thyristors
Fans and thermal management
Fan replacement, temperature management repair and thermal sensor service in UPS
Cleaning and regeneration
Decontamination, electrolytic capacitor replacement and auxiliary power supply regeneration
Why repair the UPS?
-
Save 50–75%
A new APC or Eaton 3 kVA UPS costs 3000–8000 PLN. Repair costs many times less.
-
Fast — infrastructure is waiting
Without a working UPS, servers and production lines are unprotected. We repair with priority in 3–5 days.
-
Full diagnostics
Beyond fixing the fault, we check the condition of all batteries, charging section and inverter.
-
Discontinued models
We repair UPS units for which there is no longer official manufacturer service or new parts.
-
Test report
After repair we document load test results, backup time and battery charge status.
-
Ecology
Disposing of a large UPS is a significant environmental burden. Repair extends the device life by years.
How does the repair work?
Form or phone — describe the fault and provide the UPS model
We pick up at the order cost or you bring it to the service center
Battery, inverter, charger measurements — no-obligation repair quote
Replacement of damaged components, batteries, electronics
Power failure simulation, backup time measurement and efficiency testing
UPS returns with 12-month warranty on the repair performed
Send UPS for repair
Fill out the form — we will call back and confirm order acceptance within 1 h.
Frequently asked questions
We repair completely — both VRLA/Li-Ion batteries and electronics: inverter, charging section, bypass, communication cards. Diagnostics will identify the exact cause of the fault.
This may indicate a charging section failure, a battery temperature sensor problem or a damaged BMS controller. After diagnostics we will identify the exact cause.
Yes — we repair UPS from small office 500 VA units to large modular and three-phase systems over 100 kVA (APC Galaxy, Eaton 93PM, Emerson Liebert). Contact us to arrange logistics.
Typically 5–7 business days from receiving the UPS. In urgent cases we offer express mode 24–48h — let us know when submitting the order. As a rule — repair time may be significantly extended depending on component availability and repair complexity. Deadlines are agreed individually with the client.
The warranty covers all replaced components and service work. If the same fault appears within 12 months — we repair free of charge.